Lumemach (Shenzhen Apex-Dyne Precision Machining Ltd.) runs 12 five-axis machining centers and a complete in-house tooling shop — from mold design to finished components for medical, aerospace, semiconductor and robotics programs.
Quotes taking a week? Tolerances drifting between shipments? Standard RFQs answered within 4 working hours — with CMM reports on every shipment.

Mold to part, under one roof.

Five-axis, three- and four-axis, turn-mill and CNC turning of metals and engineering plastics — on Hermle, DMG MORI, Makino and Brother machining centers, with every finishing process in-house.
CNC capabilities →
A tooling shop that has been designing, cutting, fitting and proving out molds since 2007: injection, insert, overmold, two-shot and zinc-aluminum die-casting — with molding on 128T–250T presses under the same roof. From your drawing or a sketch.
Mold making →Turning, milling, grinding, wire EDM, EDM, sandblasting, wire drawing and laser marking under one roof — for short, controlled lead times.
100% first-article inspection, in-process checks and Zeiss CONTURA CMM reports with every shipment.
Industrial design, engineering and mold design (ID / ED / MD) from your drawing — or from a rough concept.
Quotes within 4 hours; complex projects answered within 3 days. Keeping customers waiting is never an option.
Five-axis work holds ±0.003 mm and turn-mill ±0.0025 mm; precision mold parts reach ±0.002 mm on cores, cavities and inserts.
Standard RFQs are quoted within 4 working hours; complex projects get a full engineering answer within 3 days.
MOQ is 1 piece — prototypes, bridge production and volume runs share the same production lines and the same quality controls.
Full material and process traceability — 100% first-article inspection and Zeiss CONTURA CMM reports with every shipment.
Shenzhen Bao'an plant: 12 five-axis machining centers (Hermle, DMG MORI, Beijing Jingdiao, FEELER), a Mazak turn-mill cell, 27 CNC lathes and Zeiss CONTURA CMM inspection — 37 machining plus 14 inspection machines.
Worldwide door-to-door from Shenzhen: DHL / FedEx / UPS for samples, air or sea freight for production volumes.
The questions industrial buyers ask most — answered with facts, not brochures.
Six checks that separate real shops from middlemen.
Read the answer →4-hour standard quotes — and what drives production lead time.
Read the answer →MOQ 1 explained: prototypes on production discipline.
Read the answer →Send a drawing, a sketch or a photo of the part. Our engineers reply with pricing and DFM feedback — no obligation, and we are glad to sign your NDA first.
Or reach Anthony directly:
From surgical-robot assemblies to wafer-handling components — the same machines, the same discipline, across demanding sectors.




A selection of components currently in production.








Short, direct answers to what buyers ask us most. Anything missing — e-mail [email protected], we reply within 4 hours.
Send a drawing, a sketch or a sentence. We reply within 4 hours; complex projects within 3 days.